{"created":"2023-06-20T13:43:19.935267+00:00","id":1060,"links":{},"metadata":{"_buckets":{"deposit":"168bbb67-b2bf-490e-8ef3-bafd199c4e57"},"_deposit":{"created_by":2,"id":"1060","owners":[2],"pid":{"revision_id":0,"type":"depid","value":"1060"},"status":"published"},"_oai":{"id":"oai:fut.repo.nii.ac.jp:00001060","sets":["1"]},"author_link":["12280","12277","12279","12276","12278","12281"],"item_10002_biblio_info_7":{"attribute_name":"書誌情報","attribute_value_mlt":[{"bibliographicIssueDates":{"bibliographicIssueDate":"2013-07-19","bibliographicIssueDateType":"Issued"},"bibliographicIssueNumber":"43","bibliographicPageEnd":"373","bibliographicPageStart":"363","bibliographic_titles":[{"bibliographic_title":"福井工業大学研究紀要"}]}]},"item_10002_description_5":{"attribute_name":"抄録","attribute_value_mlt":[{"subitem_description":"The reexamination argument on nuclear power has arisen after the Fukushima accident. When nuclear power generation has been stopped, it is forced however, to depend on thermal power generation. In that case, the two serious problems of a jump of fuel cost and of global warming issue, that is CO2 emission issue, will be faced. So, it is still required for nuclear power generation to take an important part as basic energy source in our country for years to come. In this paper, we will describe the outline of the severe accident such as a SBO (Station Blackout) accident which happened in Fukushima and also discuss the safety assessment for the plant action when a SBO accident occurred in the case of PWR power plant through the simulation experiments using a PWR power plant simulator. As a result, fuel and fuel cladding temperatures rose abruptly about 3 hours after the SBO accident occurrence for loss of nuclear cooling functions, and it was also shown that cladding tubes damages begin. Conversely, even if a SBO accident should have happened, when power supply restoration was possible within about 3 hours, it was shown that a nuclear reactor can be changed into a cold shutdown state.","subitem_description_type":"Abstract"}]},"item_10002_identifier_registration":{"attribute_name":"ID登録","attribute_value_mlt":[{"subitem_identifier_reg_text":"10.57375/00001054","subitem_identifier_reg_type":"JaLC"}]},"item_10002_publisher_8":{"attribute_name":"出版者","attribute_value_mlt":[{"subitem_publisher":"福井工業大学"}]},"item_10002_relation_11":{"attribute_name":"書誌レコードID","attribute_value_mlt":[{"subitem_relation_type_id":{"subitem_relation_type_id_text":"TF00009513","subitem_relation_type_select":"NCID"}}]},"item_10002_version_type_20":{"attribute_name":"著者版フラグ","attribute_value_mlt":[{"subitem_version_resource":"http://purl.org/coar/version/c_970fb48d4fbd8a85","subitem_version_type":"VoR"}]},"item_creator":{"attribute_name":"著者","attribute_type":"creator","attribute_value_mlt":[{"creatorNames":[{"creatorName":"尾崎, 禎彦"}],"nameIdentifiers":[{"nameIdentifier":"12276","nameIdentifierScheme":"WEKO"}]},{"creatorNames":[{"creatorName":"大坂, 尚史"}],"nameIdentifiers":[{"nameIdentifier":"12277","nameIdentifierScheme":"WEKO"}]},{"creatorNames":[{"creatorName":"道内, 真"}],"nameIdentifiers":[{"nameIdentifier":"12278","nameIdentifierScheme":"WEKO"}]},{"creatorNames":[{"creatorName":"Ozaki, Yoshihiko","creatorNameLang":"en"}],"nameIdentifiers":[{"nameIdentifier":"12279","nameIdentifierScheme":"WEKO"}]},{"creatorNames":[{"creatorName":"Osaka, Takashi","creatorNameLang":"en"}],"nameIdentifiers":[{"nameIdentifier":"12280","nameIdentifierScheme":"WEKO"}]},{"creatorNames":[{"creatorName":"Michiuchi, Makoto","creatorNameLang":"en"}],"nameIdentifiers":[{"nameIdentifier":"12281","nameIdentifierScheme":"WEKO"}]}]},"item_files":{"attribute_name":"ファイル情報","attribute_type":"file","attribute_value_mlt":[{"accessrole":"open_date","date":[{"dateType":"Available","dateValue":"2023-04-12"}],"displaytype":"detail","filename":"363-373.pdf","filesize":[{"value":"6.4 MB"}],"format":"application/pdf","licensetype":"license_note","mimetype":"application/pdf","url":{"label":"363-373.pdf","url":"https://fut.repo.nii.ac.jp/record/1060/files/363-373.pdf"},"version_id":"55f4e80a-36fc-4f4c-bfe8-9804af3c3934"}]},"item_keyword":{"attribute_name":"キーワード","attribute_value_mlt":[{"subitem_subject":"Plant Behavior in a Station Blackout Accident","subitem_subject_scheme":"Other"},{"subitem_subject":"PWR plant simulator","subitem_subject_scheme":"Other"},{"subitem_subject":"Nuclear power plant","subitem_subject_scheme":"Other"},{"subitem_subject":"Safety assessment","subitem_subject_scheme":"Other"},{"subitem_subject":"Severe Accident","subitem_subject_scheme":"Other"},{"subitem_subject":"Sever Accident Management","subitem_subject_scheme":"Other"}]},"item_language":{"attribute_name":"言語","attribute_value_mlt":[{"subitem_language":"jpn"}]},"item_resource_type":{"attribute_name":"資源タイプ","attribute_value_mlt":[{"resourcetype":"departmental bulletin paper","resourceuri":"http://purl.org/coar/resource_type/c_6501"}]},"item_title":"シビアアクシデント時の原子炉プラント挙動に関する基礎的検討 -PWR プラントを中心に-","item_titles":{"attribute_name":"タイトル","attribute_value_mlt":[{"subitem_title":"シビアアクシデント時の原子炉プラント挙動に関する基礎的検討 -PWR プラントを中心に-"},{"subitem_title":"Basic Study on the Nuclear Reactor Plant Action at the Time of a Severe Accident Occurrence","subitem_title_language":"en"}]},"item_type_id":"10002","owner":"2","path":["1"],"pubdate":{"attribute_name":"公開日","attribute_value":"2013-07-19"},"publish_date":"2013-07-19","publish_status":"0","recid":"1060","relation_version_is_last":true,"title":["シビアアクシデント時の原子炉プラント挙動に関する基礎的検討 -PWR プラントを中心に-"],"weko_creator_id":"2","weko_shared_id":-1},"updated":"2023-06-20T14:20:33.219794+00:00"}